<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Juan.co</title><description>Personal website and blog of Juan González.</description><link>https://juan.co/</link><item><title>Telling Them No</title><link>https://juan.co/blog/telling-them-no/</link><guid isPermaLink="true">https://juan.co/blog/telling-them-no/</guid><description>The most success-oriented answer to a customer&apos;s request is sometimes no. The Feedback Cycle is on the shelf, with the log.</description><pubDate>Sun, 01 Nov 2026 16:40:00 GMT</pubDate><content:encoded>&lt;p&gt;In 2018 I told my Customer Success team something I still believe. To make a customer loyal, we have to be the ones who speak on their behalf. That means reminding them what is important and why we are here for them, and in many ways that is going to take telling them no. Not because no is the most service-oriented response, but because it is the most success-oriented one. That idea is at the heart of the play now on the shelf as &lt;a href=&quot;/playbooks/the-feedback-cycle/&quot;&gt;The Feedback Cycle&lt;/a&gt;: a manual, and a log that closes the loop.&lt;/p&gt;

&lt;p&gt;The play answers every piece of feedback a customer gives: a survey score, a request, &quot;this isn&apos;t what we expected,&quot; a frustration mentioned in passing. Every answer has two halves and a recommendation. The short-term option is something the customer can do this week. The long-term solution comes with an honest status: shipped, planned, or not planned. Shipped means show them. Planned means a direction, not a promise, and a row on the log that stays open until it ships and they are told. Not planned means a structured call, the reason, and what I would do instead. It all runs on &lt;a href=&quot;/blog/one-three-seven/&quot;&gt;One, Three, Seven&lt;/a&gt;, and it ends when the customer agrees, in writing.&lt;/p&gt;

&lt;p&gt;The hardest of the three is the no, and it is the one customers remember with respect. Left unconfronted, a request no one answers sends its own message: that the way things are is acceptable. Silence is consent. Twelve pages, free to use with attribution, with the log beside it.&lt;/p&gt;</content:encoded></item><item><title>One, Three, Seven</title><link>https://juan.co/blog/one-three-seven/</link><guid isPermaLink="true">https://juan.co/blog/one-three-seven/</guid><description>Every client-facing team I have led has run on the same three numbers: the same day, three days, seven days. Here is the standard, and why each number is where it is.</description><pubDate>Sun, 01 Nov 2026 14:21:00 GMT</pubDate><content:encoded>&lt;p&gt;Every client-facing team I have led has run on the same three numbers. I call it 1-3-7, and it applies wherever a customer is waiting on us: in support, in services, in success.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;One: the same day, acknowledge the request.&lt;/strong&gt; Call; if you reach voicemail, call back; then email a recap. Say when you will respond with next steps, as a date, not &quot;soon.&quot; Acknowledging is not resolving. It tells the customer a person has their request and when they will hear from us next.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Three: within three days, a touchpoint that consolidates the feedback and makes it actionable.&lt;/strong&gt; Define the problem, recommend the solution and give the timeline, then call to confirm the customer received it and accepts it. By day three most customers have explained their problem more than once. This is where they stop explaining and start deciding.&lt;/p&gt;

&lt;p&gt;&lt;strong&gt;Seven: within seven days, a major update, or the complete resolution or action plan.&lt;/strong&gt; Where the real fix takes longer, the workaround and the options arrive inside the seven days. A week is about as long as a customer will wait before they decide we have forgotten them.&lt;/p&gt;

&lt;p&gt;It is a standard, not a feature of any one play. Every play on the shelf that answers a waiting customer carries it word for word: &lt;a href=&quot;/playbooks/the-success-initiative/&quot;&gt;The Success Initiative&lt;/a&gt;, &lt;a href=&quot;/playbooks/the-adoption-workshop/&quot;&gt;The Adoption Workshop&lt;/a&gt;, and the Feedback Cycle when it ships. If you want one number for any client-facing team, count how often each of the three was met. That is the first number I read.&lt;/p&gt;</content:encoded></item><item><title>Able to Do This Themselves</title><link>https://juan.co/blog/able-to-do-this-themselves/</link><guid isPermaLink="true">https://juan.co/blog/able-to-do-this-themselves/</guid><description>Every Customer Success team eventually writes the same line in an account&apos;s notes: they all need to be retrained. The Adoption Workshop is on the shelf, with the planner.</description><pubDate>Sun, 01 Nov 2026 14:20:00 GMT</pubDate><content:encoded>&lt;p&gt;Every Customer Success team eventually writes the same line in an account&apos;s notes: &lt;em&gt;they all need to be retrained.&lt;/em&gt; A champion leaves, a team of new managers arrives, the logins thin out, and the product the customer paid for sits unused. In 2018 my team wrote a better line under it, and it is the one that matters: &lt;em&gt;the customer should be able to do this themselves.&lt;/em&gt; That line is the heart of the play now on the shelf as &lt;a href=&quot;/playbooks/the-adoption-workshop/&quot;&gt;The Adoption Workshop&lt;/a&gt;: a manual, and a planner that runs it.&lt;/p&gt;

&lt;p&gt;The play starts with why, not with training. Lost adoption comes from one of three causes. The customer bought the wrong thing, they use it but don&apos;t see the value, or they simply stopped using it. Only the last two are a workshop&apos;s to fix. Then come one to three objectives, each one something the customer will be able to do. &quot;Know,&quot; &quot;learn&quot; and &quot;understand&quot; are never allowed; it has to be something you could watch them do. Each objective is tied to a usage signal and a result their business cares about. The workshop is sixty minutes with the customer driving the screen, and homework is set before anyone leaves. Seven days later there is a check-back, validated three ways. The play ends when their use is back to normal and holding, within thirty days, or the account escalates. Like every play where a customer is waiting on us, it runs on &lt;a href=&quot;/blog/one-three-seven/&quot;&gt;One, Three, Seven&lt;/a&gt;.&lt;/p&gt;

&lt;p&gt;I used to put the stakes to my team as an equation: no adoption means no value, and no value means churn, the kind we control. Twelve pages, free to use with attribution, with the planner beside it.&lt;/p&gt;</content:encoded></item><item><title>Resolve to Steady State</title><link>https://juan.co/blog/resolve-to-steady-state/</link><guid isPermaLink="true">https://juan.co/blog/resolve-to-steady-state/</guid><description>When an account&apos;s problems pile up, the customer doesn&apos;t see five cases in three queues. They see one problem: that we aren&apos;t handling it. The Success Initiative is on the shelf, with the tracker.</description><pubDate>Sun, 01 Nov 2026 01:50:00 GMT</pubDate><content:encoded>&lt;p&gt;A customer with five open cases in three queues and a stalled project does not experience our org chart. They experience one problem: that we are not handling it. The answer I built for that in 2017, and carried to two more companies after, is a play with a plain instruction at its heart — &quot;over the course of the next seven to thirty days, resolve to steady state.&quot; It is now on the shelf as &lt;a href=&quot;/playbooks/the-success-initiative/&quot;&gt;The Success Initiative&lt;/a&gt;: a manual, and a tracker that keeps the clock.&lt;/p&gt;

&lt;p&gt;The play is simple to say and hard to do well. Customer Success gathers everything open on the account into one engagement, opens it with a structured call, and puts it on one page both sides sign: what is in scope, who leads on each side, and the state that ends it, in the customer&apos;s words. Then three verbs for every item — evaluate the root cause, analyze the impact on their business, synthesize options with a recommendation — so that every decision lands back in the customer&apos;s court with what they need to make it. Every reactive item runs on 1-3-7: acknowledged the same day, a consolidated and actionable plan within three, a major update or the resolution within seven. And it ends only when the customer says it is over.&lt;/p&gt;

&lt;p&gt;When I taught it in 2018, I ranked it honestly: the Business Review is the highest-value motion in Customer Success, and this is the lowest — the one you can spend the most time on. That is why the manual ends with four measures and why the best of them is that you need the play less. Eleven pages, free to use with attribution, with the tracker beside it.&lt;/p&gt;</content:encoded></item><item><title>The Ending Depends Upon the Beginning</title><link>https://juan.co/blog/the-ending-depends-upon-the-beginning/</link><guid isPermaLink="true">https://juan.co/blog/the-ending-depends-upon-the-beginning/</guid><description>Finis origine pendet: the ending depends upon the beginning. Churn is baked in during the first ninety days, and a customer is paid for long before they are earned. The Customer Journey is on the shelf, with the map.</description><pubDate>Sat, 31 Oct 2026 09:50:00 GMT</pubDate><content:encoded>&lt;p&gt;There is a Latin line I have carried through every Customer Success organization I have led: &lt;em&gt;finis origine pendet&lt;/em&gt; — the ending depends upon the beginning. I have built the same customer journey three times, in 2017, 2018 and 2019, for three software companies in three industries, and every time the map taught me the same thing: the renewal is decided long before anyone starts talking about it. That map, generalized and written out, is now on the shelf as &lt;a href=&quot;/playbooks/customer-journey/&quot;&gt;The Customer Journey&lt;/a&gt;: a manual, and a workbook that is the map.&lt;/p&gt;

&lt;h2&gt;Where churn is baked in&lt;/h2&gt;

&lt;p&gt;In my career, churn has had one birthplace more than any other: Hypercare, the ninety days after onboarding. That is when a customer answers, privately and early, the questions that decide the renewal. Was this worth the price I just paid? Did I make the right decision? What is my experience like at the start? Once those answers settle, they are very hard to reopen. A renewal conversation in month twenty-two mostly reads back what month two wrote.&lt;/p&gt;

&lt;p&gt;So the map puts two gates inside those ninety days. At thirty days, a Value Workshop: the customer tells us what they are doing differently because of what they bought. At ninety, a graduation checkpoint: we confirm the customer is mature, and only then does Hypercare end. Neither gate is about us. Each one ends when the customer grants it.&lt;/p&gt;

&lt;h2&gt;Paid for before they are earned&lt;/h2&gt;

&lt;p&gt;The economics say the same thing. In traditional SaaS, a customer is paid for before they are earned: the company spends the cost of acquiring them up front, then waits out the payback period — in my experience ordinarily thirteen to fourteen months before the customer&apos;s monthly rate has repaid that cost and begins to show a positive gross profit. That is why so many contracts run twenty-four months or longer. And it is why the first year decides the economics: a customer who leaves inside the payback period never paid for themselves, and everything spent winning them leaves with them.&lt;/p&gt;

&lt;h2&gt;A map, not a process&lt;/h2&gt;

&lt;p&gt;The unit of the journey is the moment, and every moment answers the same questions: what it is, the signal that starts it, the outcome that ends it, and who does what. Forty-two of them, from the first lead to the offboarding, across four stages and eight functions, each touching one of the twelve milestones the organization runs. Each has exactly one owning team, because two owners is no owner; any number of others can be held to account for a defined part of the work in support of it, and the row says for what. Every outcome is written as a state of the customer — &quot;the customer confirms value,&quot; never &quot;we held a meeting&quot; — because a journey is the steps the customer takes toward their own outcomes, not a list of our activities.&lt;/p&gt;

&lt;p&gt;Customer Success is the steward of the map. It owns about half the moments and touches nearly all of them, not because it does most of the work, but because its job is to bring out the best in every team that does. The plays on this shelf hang from the map as moments with triggers of their own, and &lt;a href=&quot;/playbooks/customer-health-score/&quot;&gt;the Customer Health Score&lt;/a&gt; is what reads the signals.&lt;/p&gt;

&lt;h2&gt;Renewal is a trigger, not a date&lt;/h2&gt;

&lt;p&gt;Most organizations have no gate to start thinking about a renewal until thirty to sixty days before the contract expires. By then the decision has been made; the conversation only finds out what it was. On this map, renewal nurture starts on the first trigger to fire — health turning Yellow or Red in the last six months, the customer&apos;s own buying cycle, or a lead time each tier sets from how its customers buy — and its only purpose is to re-align value while there is still time to change the answer.&lt;/p&gt;

&lt;p&gt;Fourteen pages, free to use with attribution, with the workbook beside it: the map in blue cells to rewrite for your company, an owner check that turns red when a row breaks the rule, a count of who owns what, and a tracker that tells you which accounts owe a Value Workshop, a graduation or a renewal conversation this week. The companies and their products are gone from both. The beginning, and what it decides, is intact.&lt;/p&gt;</content:encoded></item><item><title>Healthy Customers Are Successful</title><link>https://juan.co/blog/healthy-customers-are-successful/</link><guid isPermaLink="true">https://juan.co/blog/healthy-customers-are-successful/</guid><description>A health score is not a number. It is four questions that can each fail, asked against what a good customer looks like at this stage — and a play for every answer. The Customer Health Score is on the shelf, with the scorecard.</description><pubDate>Thu, 29 Oct 2026 20:55:00 GMT</pubDate><content:encoded>&lt;p&gt;Every Customer Success organization I have led has had a health score, and I have built the same one three times, for companies across the scale and service spectrum, because the thing that makes it work is not the data. It is a rule. In 2018, running Customer Success for a hospitality-software company, I wrote the rule down for the team and taught it in an hour, and that presentation and that lesson plan are now on the shelf as &lt;a href=&quot;/playbooks/customer-health-score/&quot;&gt;The Customer Health Score&lt;/a&gt;: a manual, and a workbook that is the instrument.&lt;/p&gt;

&lt;h2&gt;Four questions that can each fail&lt;/h2&gt;

&lt;p&gt;A health score that is a weighted number is a score that can be argued with. Three good signals average away one bad one, and the bad one is the churn. So the instrument asks four questions — is the customer using what they bought, are they getting the results they bought it for, what is it like to be served by us, what are they saying about us — from four sources: the product, the CSM, the support queue and the invoice, the survey. Each answer is Green, Yellow or Red. And the rule is deliberately unforgiving: any component in a fail state makes the account Red, and names the play that answers it. A customer who has stopped logging in is a fact about the renewal on its own, however the other three look. The instrument says so without arithmetic.&lt;/p&gt;

&lt;p&gt;There is a number beside the color — a resemblance score, zero to a hundred — and it exists for trend and ranking only. It never overrides the color. A Yellow drifting from 80 to 55 is visible before it fails; that is all the number is for.&lt;/p&gt;

&lt;h2&gt;Resemble whom?&lt;/h2&gt;

&lt;p&gt;Not all customers are measured equally. A customer at each stage of the journey is modeling the behavior that leads to a renewal, an expansion, or a churn, and that behavior can be scored — against the right thing. The right thing is not an industry benchmark, which describes someone else&apos;s customers. A company generally knows what a good customer from its own pool looks like. Take the accounts that renewed and grew, read their numbers at each stage, and those are the thresholds. The question the score asks is then always the same: how much does this customer, now, resemble a Green customer at this stage?&lt;/p&gt;

&lt;p&gt;The stages matter because of where churn originates. Most of it leaves the path during onboarding and in the ninety days after first value, which is why health is most predictive there, why the Hypercare profile in the workbook is the tightest, and why a Hypercare account that is not Green gets its play this week and not this quarter. Hypercare is a touch, not a tier: whatever the account pays, a new customer gets a human while the behavior that predicts its renewal is being formed.&lt;/p&gt;

&lt;h2&gt;What we do with the answer&lt;/h2&gt;

&lt;p&gt;An instrument measures and then says what to do, or it is a report. Each failed component names one of the &lt;a href=&quot;/playbooks/customer-success-operating-model/&quot;&gt;Operating Model&lt;/a&gt;&apos;s four plays — not engaged, an adoption workshop; cases aging or an invoice unpaid, a success initiative; a detractor, the feedback cycle; a review overdue, &lt;a href=&quot;/playbooks/the-business-review/&quot;&gt;the business review&lt;/a&gt; — and the scorecard writes the play on the row. A CSM&apos;s week is the play-due column sorted by color. A manager&apos;s Monday is the Book tab: Reds first, then Hypercare, then the plays due. The executive team&apos;s forecast is the same tab, and nobody has to ask the account owner what&apos;s happening.&lt;/p&gt;

&lt;p&gt;When I first scored a whole book this way and read the Reds one by one, three causes accounted for nearly all of them: inconsistent adoption, operations that had slipped, and a play that the score had named and nobody had run. All three were controllable. That is the most hopeful thing a health score ever told me, and it is the reason the manual ends with the lesson plan: a score the team does not understand is a column they ignore.&lt;/p&gt;

&lt;p&gt;Fourteen pages, free to use with attribution, with the scorecard workbook beside it — example thresholds in blue, an invented book of twelve restaurants so you can see the rule work, and a Book tab for Monday. The company and its platform are gone from both; the rule is intact.&lt;/p&gt;</content:encoded></item><item><title>A Document You Hand the Customer</title><link>https://juan.co/blog/a-document-you-hand-the-customer/</link><guid isPermaLink="true">https://juan.co/blog/a-document-you-hand-the-customer/</guid><description>In 2016 I wrote down, for our largest customers, how we would work together — and handed it to them. The Engagement Framework is on the shelf, with the document itself.</description><pubDate>Thu, 29 Oct 2026 10:45:00 GMT</pubDate><content:encoded>&lt;p&gt;In 2016 I ran Customer Success for a software company whose largest customers were larger than most of its departments. Each of them had a dozen people on our side touching the account, and nobody on their side knew who any of them were, who to call when something broke, or what we had actually promised. So I wrote it down — who was on the account on both sides and who each person&apos;s peer was, who the one operating executive was and how escalation reached them, which meetings stood and how often, the six dimensions on which we would score the partnership every quarter, what support promised by severity, how releases would be announced, and how we would take adoption to their offices in waves — and I handed it to them. Then both companies lived by it. It is on the shelf today as &lt;a href=&quot;/playbooks/engagement-framework/&quot;&gt;The Engagement Framework&lt;/a&gt;: a manual, and the document itself with every name and number in brackets.&lt;/p&gt;

&lt;h2&gt;A model for one account&lt;/h2&gt;

&lt;p&gt;The &lt;a href=&quot;/playbooks/customer-success-operating-model/&quot;&gt;Operating Model&lt;/a&gt; says how a Customer Success organization is built. This says how a single strategic account is built — the dedicated tier, one manager to seven accounts, where the relationship is large enough to deserve its own written constitution. It is the third model in the Customer Success section, and I had said two was the right number; I was wrong, because this is the Operating Model&apos;s natural counterpart, and the shelf is stronger with the pair.&lt;/p&gt;

&lt;p&gt;Two things made the original work, and both were in its opening paragraph. The first was transparency about the gap: the framework described service levels we were still in the process of achieving, said so, and gave the goal and the timeline, so that the customer could hold us to them — which is the only way a promise becomes a relationship. The second was that it was written for the customer, not about them. No internal process appears in it unless the customer can see it, call it, or escalate through it.&lt;/p&gt;

&lt;h2&gt;What scales down&lt;/h2&gt;

&lt;p&gt;I would not pretend it is a universal engagement model. It was written for strategic accounts, and parts of it — a named Customer Success Executive, a steering committee, field visits — do not survive below that tier. But every component has a shared-tier and a digital-tier form, and the manual gives all of them in one table, because knowing which parts collapse and which disappear is most of what it means to design the lower tiers well. Three rows survive intact all the way down: escalation, the severity table, and the release rhythm. Those are the vendor&apos;s promises, and they should be identical for every customer. The framework only makes them personal.&lt;/p&gt;

&lt;h2&gt;Where the maturity model came from&lt;/h2&gt;

&lt;p&gt;The six dimensions the framework scores every quarter — strategic alignment, business impact, roadmap synergy, solution adoption, support quality, program management — are the origin of the Partnership Maturity Model that &lt;a href=&quot;/playbooks/the-business-review/&quot;&gt;The Business Review&lt;/a&gt; scores on five levels. In 2016 they were questions; by 2022 each had a scale and a radar chart, and the gap between the vendor&apos;s score and the customer&apos;s had become the agenda of the review. The questions came first, and they are still the right ones to ask before anyone scores anything.&lt;/p&gt;

&lt;p&gt;Thirteen pages, free to use with attribution, with a Word template beside it that a Customer Success leader can fill in with the customer in the room. The company, its colleagues and its product mechanics are gone from both; the way of working is intact.&lt;/p&gt;</content:encoded></item><item><title>Fifteen Minutes</title><link>https://juan.co/blog/fifteen-minutes/</link><guid isPermaLink="true">https://juan.co/blog/fifteen-minutes/</guid><description>The annual review answers none of the three questions a leader actually has about a person. The nine box answers all three in fifteen minutes — and it is now on the shelf with its template.</description><pubDate>Wed, 28 Oct 2026 23:17:00 GMT</pubDate><content:encoded>&lt;p&gt;In 2017 I inherited an annual review process: weeks of forms, self-assessments, calibration meetings and ratings on a five-point scale. At the end of it I had no answer to the only three questions I actually had about anyone on the team. Is this person in the right role? Are they being challenged? Are they being rewarded — in growth and in money — in proportion to what they are doing and what they could do? The process was painstaking, and it was irrelevant to every decision I had to make.&lt;/p&gt;

&lt;p&gt;So I used the nine box instead, and reviewed the whole organization in fifteen minutes. It is on the shelf today as &lt;a href=&quot;/playbooks/nine-box/&quot;&gt;The Nine Box&lt;/a&gt; — a manual and a template — the fourth instrument, and the one that joins two things already there.&lt;/p&gt;

&lt;h2&gt;Two axes, and the mistake everyone makes&lt;/h2&gt;

&lt;p&gt;Performance across, potential up, nine boxes. Everyone knows the grid; almost everyone scores the second axis wrong. Performance is about the role the person has — results against the key results they own this quarter. Potential is about the role they do not have yet: the three unteachable behavioral competencies from the &lt;a href=&quot;/playbooks/competency-model/&quot;&gt;Competency Model&lt;/a&gt; — strategic thinking, building effective relationships, bias for action — read against the demands of the &lt;em&gt;next&lt;/em&gt; role, in the weights that role needs. A high performer is not automatically high potential, and the grid has a box, the trusted professional, precisely for the expert who is exactly where they should be and should never be promoted into misery. Score performance from the numbers and potential from the behaviors, and the instrument joins &lt;a href=&quot;/playbooks/objectives-and-key-results/&quot;&gt;Objectives and Key Results&lt;/a&gt; on one side to the Competency Model on the other.&lt;/p&gt;

&lt;h2&gt;A placement is an instruction&lt;/h2&gt;

&lt;p&gt;Every box carries a move, and the move is the point. Top right: invest — strategic initiatives, named successors, pay ahead of the market before the market asks. The diagonal: selectively invest — training for the core, respect and expert pay for the professional, a decision date for the new hire nobody can read yet. Bottom left: the conversations that are overdue, with a clock on them. The grid is also a budget, and the pattern of the budget is a diagonal, not a ladder. Growth should be predictable: a person should be able to see their next quarter and their next year from their own placement, and the most honest career conversation most managers will ever have takes five minutes, because the picture does the talking.&lt;/p&gt;

&lt;h2&gt;Why fifteen minutes&lt;/h2&gt;

&lt;p&gt;The review is fast because the scoring is done before it and the conversations are done after it. Managers score alone, from the quarter&apos;s results and the competencies; the meeting reads the grid aloud, argues only the disagreements — which are always about potential, and always resolve into &quot;which role, and which competency?&quot; — and leaves with one move per person, written. The crucial conversations happen within two weeks. Then the quarter runs, and the grid is drawn again, and people should have moved: up as they grow, across as they are challenged, out of the bottom left one way or the other. A grid that looks the same two quarters running is a review that did not happen.&lt;/p&gt;

&lt;p&gt;Ten pages, free to use with attribution, with a roster that computes the box and a grid that counts the team. The names in it are invented. The method is nine years old and has not needed to change.&lt;/p&gt;</content:encoded></item><item><title>Two Letters Struck Through</title><link>https://juan.co/blog/two-letters-struck-through/</link><guid isPermaLink="true">https://juan.co/blog/two-letters-struck-through/</guid><description>The shelf&apos;s last section opens with a model: objectives and key results, which are management by objectives with the ceiling removed — and the weekly check-in that makes any of it work.</description><pubDate>Wed, 28 Oct 2026 21:51:00 GMT</pubDate><content:encoded>&lt;p&gt;Everyone was taught to set S.M.A.R.T. goals. Specific, measurable, achievable, realistic, timely. Two of those five letters are the reason most goals do nothing: &lt;em&gt;achievable&lt;/em&gt; and &lt;em&gt;realistic&lt;/em&gt; cap a goal at what the person setting it already knows how to do, and a goal set that way is met, reported and forgotten, because nothing about the organization had to change to meet it. Strike the two letters and you have objectives and key results — specific, measurable, timely, and deliberately set past what is known, with seventy percent of the way there counted as success. The shelf&apos;s Business Transformation section opens today with that model: &lt;a href=&quot;/playbooks/objectives-and-key-results/&quot;&gt;Objectives and Key Results&lt;/a&gt;.&lt;/p&gt;

&lt;h2&gt;A model, not a goal-setting tip&lt;/h2&gt;

&lt;p&gt;The acronym is the easy part. What makes OKRs a model — how the organization is built, in the shelf&apos;s sense — is the cascade. Objectives are set only at the company level, three to five for the year, by the executive team. Department heads write the key results against them, and those key results become the departments&apos; objectives. Individuals write their own key results, aligned to their department, one committed and one aspirational. Four levels, each written by different people, each level&apos;s results becoming the next level&apos;s aims. An organization that lets every department write its own objectives has five pyramids and no company.&lt;/p&gt;

&lt;p&gt;The numbers have to be interdependent, and they have to be visible. One person&apos;s retention target is the same fact as the Customer Success leader&apos;s metric and the Board&apos;s expectation for the year, cut to one person&apos;s size; and everyone can see everyone&apos;s, up to the Board&apos;s and down to the newest hire&apos;s, because an interdependent number that is hidden is just a target. That transparency is what turns &quot;we are all Customer Success&quot; from a poster into a fact.&lt;/p&gt;

&lt;h2&gt;The check-in&lt;/h2&gt;

&lt;p&gt;I have run this model with tools and without, as an executive and as a consultant, and the best correlating factor I have found for whether people make progress on the numbers they own is not the software or the scoring. It is the weekly, human-centric check-in: every manager with every direct report, thirty minutes, three questions — what are you achieving, where do you need help, what risks do you see — and a shared agenda that both of them can open. Above it, the cascade and the rhythm are structure. Below it, there is nothing: just someone deciding, on a Tuesday, whether the number they own is going to move this week. The manager&apos;s job in that meeting is not to inspect but to resource. That is the whole method, and it is the page of the model I would keep if I could keep only one.&lt;/p&gt;

&lt;p&gt;Twelve pages, free to use with attribution, with the first year written out from the rhythm and a checklist at the end. The shelf&apos;s three domains are all open now.&lt;/p&gt;</content:encoded></item><item><title>Capacity and Margin</title><link>https://juan.co/blog/capacity-and-margin/</link><guid isPermaLink="true">https://juan.co/blog/capacity-and-margin/</guid><description>Two instruments for a services business — how many hours you have, and whether the project you are about to sell will make money — and the spreadsheet that carried a hundred projects.</description><pubDate>Wed, 28 Oct 2026 20:41:00 GMT</pubDate><content:encoded>&lt;p&gt;Before I ran Customer Success organizations I ran a professional services firm, and the two things I learned there that I have never stopped using are not frameworks. They are spreadsheets. The shelf&apos;s Operations section opens today with both of them, as instruments: &lt;a href=&quot;/playbooks/capacity-model/&quot;&gt;The Capacity Model&lt;/a&gt; and &lt;a href=&quot;/playbooks/project-budget/&quot;&gt;The Project Budget&lt;/a&gt;, each a short manual with the workbook beside it.&lt;/p&gt;

&lt;h2&gt;A hundred projects on a spreadsheet&lt;/h2&gt;

&lt;p&gt;In 2010 I inherited the client services function of a small digital agency that was having real trouble scaling. The director before me had seen the answer — a capacity model integrated with the project plans, so that the hours a project needed met the hours the team had — and she did not have it wrong. She had not built it for scale, and a system like that comes apart somewhere around twenty or thirty concurrent projects. I rebuilt it for scale: five rows per person per month, every billable project cross-mapped against them, a weekly meeting that read the result aloud, and one rule, that nothing is accepted without a row. At its peak it carried more than sixty people across more than a hundred concurrent projects. It was, mechanically, a shared spreadsheet. It held because of the rigor around it, and it is the work that made me the firm&apos;s managing partner.&lt;/p&gt;

&lt;h2&gt;Price it to margin&lt;/h2&gt;

&lt;p&gt;The other sheet is the one the first one feeds. A project budget is hours by role by month, priced from a rate card at what the hours cost and what they sell for, with the margin on the first line — before anyone has said a number to the client. The rule is that no project is priced without one and none is accepted below the floor. Then the same grid becomes the run, with the hours actually spent typed in weekly, and finally the verdict: plan against actuals, the margin you really made, and the hours the project ate that nobody invoiced. The worked example in the template clears a sixty-four percent floor on paper and finishes under it, seventy-eight hours over in pieces no larger than twenty-four. That is how budgets die: not in the proposal, but in the fourth week, two days at a time.&lt;/p&gt;

&lt;h2&gt;Why they are instruments, and why they ship as workbooks&lt;/h2&gt;

&lt;p&gt;Neither says how an organization is built, and neither says what a person does on Tuesday. They say what to measure — hours available, hours promised, cost, sale, margin — how to compute it, and what to do with the answer: move, add, decline; invoice it, or eat it knowingly. That is the shelf&apos;s definition of an instrument. And because the instrument in each case &lt;em&gt;is&lt;/em&gt; the spreadsheet, each entry carries two downloads: the manual, and the template, with sample people, sample roles, a worked project, and the formulas intact. The colleagues, clients and salaries that were in the originals are not; the method is.&lt;/p&gt;

&lt;p&gt;I built the budget template again in 2025 for a creative agency that planned its time well and still could not see its margin — the hours, the rates and the costs lived in three places that never met. Fifteen years after the first one, the sheet&apos;s whole job was still to make them meet.&lt;/p&gt;</content:encoded></item><item><title>The Voice of the Customer</title><link>https://juan.co/blog/the-voice-of-the-customer/</link><guid isPermaLink="true">https://juan.co/blog/the-voice-of-the-customer/</guid><description>A score is a number you report. A voice is a signal you act on. The first instrument on the shelf — CSAT and NPS, kept apart and administered properly.</description><pubDate>Wed, 28 Oct 2026 14:19:00 GMT</pubDate><content:encoded>&lt;p&gt;In 2021 I took over a Customer Success organization that had a Net Promoter Score, and an honest one. It gave directional insight on the big customer-experience initiatives. It told us which departments were pulling their weight. It sampled the past so we could improve. And it could not tell a bad week from a bad relationship, a person from a program, or a team&apos;s contribution from the company&apos;s — because it was one survey, sent to everyone, after everything, asked to do two jobs at once.&lt;/p&gt;

&lt;p&gt;That is the most common state of customer listening I have seen, and the fix is not a better survey. It is two instruments. &lt;a href=&quot;/playbooks/voice-of-the-customer/&quot;&gt;The Voice of the Customer&lt;/a&gt; is the program I built to replace the one survey, rebuilt here as the first &lt;em&gt;instrument&lt;/em&gt; on the shelf.&lt;/p&gt;

&lt;h2&gt;A third word&lt;/h2&gt;

&lt;p&gt;When I put the &lt;a href=&quot;/blog/models-and-plays/&quot;&gt;Operating Model and the Business Review&lt;/a&gt; up, the shelf learned two words: a model says how the organization is built, and a play says what a person does on Tuesday. This document is neither. It does not describe a team and it does not describe a meeting. It describes a signal — what to measure, how to ask, and what to do with the answer — and both the model and the play read it. So the shelf has a third word now, and I expect to use it again: a health score is an instrument; so is a renewal forecast.&lt;/p&gt;

&lt;h2&gt;What it says&lt;/h2&gt;

&lt;p&gt;Customer Satisfaction measures happiness after a moment — a ticket closed, a contract signed, an invoice paid — on a scale of one to five, and it belongs to the team that delivered the moment. Net Promoter measures loyalty to the company — would you recommend us — on a scale of minus one hundred to plus one hundred, and it belongs to the whole company. Ask them in the same breath and the customer answers the one they just lived through, twice.&lt;/p&gt;

&lt;p&gt;The part most programs skip is that Net Promoter itself comes in two kinds. Transactional NPS is asked at the end of a journey stage — everyone who finished onboarding this quarter, as a population — and measures loyalty to the work. Relational NPS is asked of established customers twice a year, in six staggered cohorts so that some of the book answers every month, and measures loyalty in the absolute. The two scores disagree, and the disagreement is the insight: a high transactional score with a falling relational one is an organization executing well on a product the customer is losing faith in.&lt;/p&gt;

&lt;p&gt;And then the asymmetry that makes it a program rather than a dashboard. Satisfaction reaches out to the unhappy only; a satisfied customer thanked for every ticket learns that replying costs them a conversation. Net Promoter reaches out to everyone — promoters to Sales, because they just told you they would put their name behind yours; passives to Renewals; detractors to Success, because a detractor is rarely one team&apos;s doing. Get those rules backwards and you have a program that annoys the happy and ignores the loyal.&lt;/p&gt;

&lt;h2&gt;What is gone, and what is new&lt;/h2&gt;

&lt;p&gt;The company&apos;s name, its people and its systems. What is new are two drawings the program always needed and never had: the journey with both instruments placed on it, and the cohort calendar — six rows, twelve months, every contact asked twice a year and never more. Fifteen pages, free to use with attribution, and the checklist is on the last one.&lt;/p&gt;</content:encoded></item><item><title>Models and Plays</title><link>https://juan.co/blog/models-and-plays/</link><guid isPermaLink="true">https://juan.co/blog/models-and-plays/</guid><description>Two more playbooks on the shelf, and a distinction the shelf needed: a model says how the organization is built; a play says what a person does on Tuesday.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;I had three slide decks from a job I loved: an introduction to Customer Success, an introduction to the customer journey, and an introduction to business reviews. I wrote them for a leadership team and new hires at a software company where I ran the customer organization, and like most internal decks they were two-thirds pictures and one-third labels, because the person presenting them was going to say the rest. Then I left, and the rest left with me.&lt;/p&gt;

&lt;p&gt;When I started putting my playbooks on this site, the obvious thing was to redesign the three decks and post them. I sat with them for an evening and decided that would be a mistake, for a reason that turned out to be more useful than the decks themselves: they were not three documents. They were two &lt;em&gt;kinds&lt;/em&gt; of document, and the shelf needed to know the difference.&lt;/p&gt;

&lt;h2&gt;A model and a play&lt;/h2&gt;

&lt;p&gt;A &lt;strong&gt;model&lt;/strong&gt; says how the organization is built. What the discipline is, who the customer is, how the teams are shaped and sized, how a customer moves through them. You read a model once, when you are building something or have been handed something, and you argue with it. The first two decks were a model that had been cut into slides — the definition, the segmentation, the journey — and apart they were a textbook and a diagram. Together they are &lt;a href=&quot;/playbooks/customer-success-operating-model/&quot;&gt;The Customer Success Operating Model&lt;/a&gt;: eighteen pages, five parts, written out in full for the first time, because there is no longer a person standing next to them to say the rest.&lt;/p&gt;

&lt;p&gt;A &lt;strong&gt;play&lt;/strong&gt; says what a person does on Tuesday. It has an agenda, a runbook, a checklist you print. You do not read a play once; you read the relevant page before every time you run it. The third deck was a play, and folding it into the model would have buried the most useful thing I had. So it stands alone, as the first play on the shelf: &lt;a href=&quot;/playbooks/the-business-review/&quot;&gt;The Business Review&lt;/a&gt; — what it is and is not, the agenda in three movements, the executive runbook, and the checklist.&lt;/p&gt;

&lt;p&gt;The distinction sounds obvious written down. It was not obvious in the decks, and I think it is not obvious in most organizations, where the model lives in someone&apos;s head and the plays live in someone else&apos;s calendar and the two have never been introduced. Putting both on the same shelf, labeled, is the point.&lt;/p&gt;

&lt;p&gt;&lt;em&gt;Corrected 28 October 2026.&lt;/em&gt; Two words were one too few. The shelf now has a third: an &lt;strong&gt;instrument&lt;/strong&gt; says what to measure, how to ask, and what to do with the answer — neither how the organization is built nor what a person does on Tuesday, but the signal both of them read. The first is &lt;a href=&quot;/playbooks/voice-of-the-customer/&quot;&gt;The Voice of the Customer&lt;/a&gt;. The test for all three, and where each new document goes, lives on &lt;a href=&quot;/playbooks/&quot;&gt;the shelf&lt;/a&gt;; this essay stays as it was written.&lt;/p&gt;

&lt;h2&gt;What the Board report added&lt;/h2&gt;

&lt;p&gt;Halfway through, I found the quarterly strategy I had reported to the leadership team that same year, and it had the richness the introductions lacked — the things you only say to the people who have to approve the budget. Four of them went into the model: the &lt;em&gt;customer profile&lt;/em&gt;, three traits of the market and the thing each one forbids you to do; the &lt;em&gt;value curve&lt;/em&gt;, which is the customer&apos;s view of the journey — a line that rises or does not, with a churn exit at every node; the rule that &lt;em&gt;milestones have signals&lt;/em&gt;, a start and an end that a system can see, or they are a hope; and &lt;em&gt;a quarter in the model&lt;/em&gt;, what ninety days of actually running it looked like.&lt;/p&gt;

&lt;p&gt;And one went into the play. The business review&apos;s agenda says &quot;evaluate the joint scorecard of our relationship,&quot; and for years I knew what that meant and never wrote it down. It is the Partnership Maturity Model: six dimensions, each a question both sides can answer honestly, five levels of maturity, one radar chart of the account against its peers. Score it twice — once by us, once by the customer&apos;s champion — and the gap between the two sets of scores is the agenda for the middle of the meeting. That is now pages eight and nine of the play, and it is the part I would have wanted most as a new CSM.&lt;/p&gt;

&lt;h2&gt;What is gone&lt;/h2&gt;

&lt;p&gt;The company&apos;s name, its product, its numbers and its people. The frameworks keep their rules — the top ten percent of customers earn half the effort; dedicated at one to seven, shared at one to thirty, digital at one to a hundred — with the thresholds flagged as the ones I set for that price list, to be scaled to yours. I am proud of the work I did there, and the people I did it with; this is the part of it that was never theirs, written so that it can be yours.&lt;/p&gt;

&lt;p&gt;The shelf now has three things on it: a model of people, a model of the organization, and a play. The &lt;a href=&quot;/playbooks/competency-model/&quot;&gt;Competency Model&lt;/a&gt; measures a person against their potential; the Operating Model says what the organization is for; the Business Review is the first thing it does. Three more plays follow in the same shape — adoption workshops, feedback cycles, success initiatives — and the Partnership Maturity Model is big enough to be one of its own. Take them, run them, and tell me where they are wrong.&lt;/p&gt;

&lt;p&gt;&lt;a href=&quot;/playbooks/&quot;&gt;The Playbooks →&lt;/a&gt;&lt;/p&gt;</content:encoded></item><item><title>Performance Against Potential</title><link>https://juan.co/blog/the-competency-model/</link><guid isPermaLink="true">https://juan.co/blog/the-competency-model/</guid><description>For a decade I have measured people with the same instrument: not where they have been, but the distance between how they perform and what they are capable of. Today it goes on the shelf, free to take.</description><pubDate>Tue, 27 Oct 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;Every manager carries two stories. The first is the hire who interviewed like a champion — crisp answers, the right vocabulary, a handshake you remember — and who could not do the job. The second is the quiet one two desks over who could have run the place, if anyone had thought to look. I have both stories. Everyone does. They are the same story, and the moral is not &quot;interview better.&quot; It is that we were measuring the wrong thing.&lt;/p&gt;

&lt;p&gt;A résumé measures the past. An interview measures charm. A performance review, most places, measures how the last quarter felt. None of those is the thing you want, which is simpler to say than to do: &lt;strong&gt;how far is this person&apos;s performance from their potential, in this role, at this level of difficulty?&lt;/strong&gt; That distance is where every good hiring decision, every honest review and every promotion that didn&apos;t blow up in your face actually lives. I started writing down a way to measure it in 2015, made it an internal playbook at Vista Equity in 2017, and in 2020 rebuilt it to lead the Customer Success organizations I founded there and at other private-equity-backed companies. I have used it ever since. Today it goes on the shelf at &lt;a href=&quot;/playbooks/competency-model/&quot;&gt;juan.co/playbooks&lt;/a&gt;, free to take.&lt;/p&gt;

&lt;h2&gt;Three disciplines, twelve competencies&lt;/h2&gt;

&lt;p&gt;A competency, in the dry language of the trade, is a piece of knowledge, skill or ability that correlates with performance. The trick is not listing them — every company has a poster in the lunchroom — but organizing them so they can be &lt;em&gt;measured&lt;/em&gt;. Mine hang from three things I have never seen a good executive do without, whatever the title on the door: they &lt;strong&gt;think strategically and with discipline&lt;/strong&gt;, they &lt;strong&gt;act with a bias toward action&lt;/strong&gt;, and they &lt;strong&gt;build relationships that work&lt;/strong&gt;. Under those three sit twelve competencies — strives for continuous improvement, manages resources effectively, resolves conflict through empathy, and so on. You have seen lists like it. The list is not the model.&lt;/p&gt;

&lt;h2&gt;Altitude&lt;/h2&gt;

&lt;p&gt;The model is the second axis, which I call &lt;strong&gt;situational complexity&lt;/strong&gt;, and which is the thing most frameworks leave out. The same behavior means something different at a different altitude. &quot;Organizes work using processes&quot; at low complexity means following the playbook well and knowing when you have left it. At moderate complexity it means improvising inside the playbook when the customer does not match it. At high complexity it means writing the playbook that everyone below you follows, and then teaching it. Those are three different jobs, and a person can be excellent at the first and lost at the third — not because they are weak, but because nobody told them the ground had changed.&lt;/p&gt;

&lt;p&gt;So every one of the twelve competencies is described three times: what it looks like at low, moderate and high complexity, what proficiency means there, and a concrete example. That gives you two things at once. You can place a &lt;em&gt;role&lt;/em&gt; on the scale — this job is mostly moderate, with two behaviors that run high. And you can place a &lt;em&gt;person&lt;/em&gt; against the rung they hold and the one above it. The distance between the two is the whole conversation. It is the review. It is the development plan. It is, when the distance has closed, the promotion.&lt;/p&gt;

&lt;h2&gt;Why Customer Success&lt;/h2&gt;

&lt;p&gt;I built it for Customer Success because that is where I was standing — founding and running the customer organizations of software companies inside the Vista Equity portfolio and beyond, where a Customer Success Manager is asked to apply a well-understood body of practice to familiar situations &lt;em&gt;and&lt;/em&gt; to architect novel solutions for ambiguous problems with contentious stakeholders, often on the same afternoon. It is a moderate-to-high complexity domain by its nature. The middle of the document says exactly what each behavior looks like for a Customer Success Manager I, a CSM II, a Senior CSM and a Manager of Customer Success — a definition and an example for every rung — and closes with two job descriptions so that the ladder has a floor and a landing.&lt;/p&gt;

&lt;p&gt;But the disciplines were never about Customer Success. The examples were. If you run engineering, or finance, or a hospital floor, keep the first eleven pages and the last eighteen and write your own ladder in the middle. The scaffolding holds.&lt;/p&gt;

&lt;h2&gt;Where to look&lt;/h2&gt;

&lt;p&gt;The last third is the part people ask me for: for every competency, the interview questions that surface it. They are mapped to the Employee Personality Profile — Criteria&apos;s EPP, the assessment that many private-equity-backed software companies run before a candidate ever meets a hiring manager, and which I came to know well inside the portfolio. A profile does not tell you whether to hire someone. It tells you where to press. If the scale that predicts &lt;em&gt;conveys information clearly&lt;/em&gt; comes back low, you do not reject the candidate; you ask the three questions written for that behavior and listen harder than usual. Prediction is not a verdict. It is a flashlight.&lt;/p&gt;

&lt;h2&gt;What it is not&lt;/h2&gt;

&lt;p&gt;It is not a score. I have watched competency frameworks curdle into spreadsheets where a human being becomes a 3.2, and I want no part of that. The model gives you language — precise, shared, written down in advance — for a conversation that has to happen between two people in a room. Use it to make that conversation honest. Do not use it to avoid having it.&lt;/p&gt;

&lt;p&gt;More than ten versions in its current form, most of them made in the field after a hire went wrong or right in a way the document had not predicted. A decade of use is the only credential it claims. It is the first thing on the shelf, and the shelf is the point: the models, methods and operating systems I built because I needed them, written down so you do not have to. Take it, run it, and tell me where it is wrong — that is how it got here.&lt;/p&gt;

&lt;p&gt;&lt;a href=&quot;/playbooks/competency-model/&quot;&gt;The Customer Success Competency Model →&lt;/a&gt;&lt;/p&gt;</content:encoded></item><item><title>What a Machine Heard When I Couldn&apos;t Say It</title><link>https://juan.co/blog/what-a-machine-heard-when-i-couldnt-say-it/</link><guid isPermaLink="true">https://juan.co/blog/what-a-machine-heard-when-i-couldnt-say-it/</guid><description>On Friday morning, I sat down with a music generator and wrote a song. It took about ninety minutes. I should say up front that I&apos;m not a stranger to music. I&apos;ve played the piano since I was three, and I still play most weeks…</description><pubDate>Sat, 05 Sep 2026 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;On Friday morning, I sat down with a music generator and wrote a song. It took about ninety minutes.&lt;/p&gt;
&lt;p&gt;I should say up front that I&apos;m not a stranger to music. I&apos;ve played the piano since I was three, and I still play most weeks — it sits right next to video games and worldbuilding as the things I do to stay sane. I know my theory. I can tell you why a bridge that lifts into the relative major and then falls back to minor does what it does to a listener. What I have never been is a songwriter: I don&apos;t write lyrics, I don&apos;t arrange for strings, and I can&apos;t sing the part I hear in my head. (I&apos;m also a terrible sight-reader, which my sisters Christina and Victoria, both far better pianists than I am, will confirm with enthusiasm.) So I came to this as a musician with a specific, lifelong gap — and the thing that came out of it, a melancholic folk ballad called &lt;em&gt;Harbor from the Storm&lt;/em&gt;, is one of the truest pieces of work I have ever put my name on.&lt;/p&gt;
&lt;p&gt;I&apos;ve spent a lot of my career thinking about what these tools are for. Most of the conversation is about productivity: drafts, summaries, code, the twelve emails you didn&apos;t want to write. That&apos;s real, and it&apos;s where the money is. But it isn&apos;t what happened on Friday, and I think what happened on Friday is the more interesting story.&lt;/p&gt;
&lt;h2&gt;The prompt is not the point&lt;/h2&gt;
&lt;p&gt;Here is what I did not do. I did not type &quot;write a sad folk song about a harbor&quot; and hit generate. If you do that, you get exactly what you&apos;d expect: something competent, forgettable, and nobody&apos;s.&lt;/p&gt;
&lt;p&gt;What I did instead was spend the better part of an hour building context before I asked for a single note. Who is singing, and from where. What has been lost — not the event, the shape of it. What the singer refuses to say, and what he&apos;s willing to. A rule that the song could not resolve to a triumphant ending, because the thing it was about doesn&apos;t. A rule that it could not name a person. A rule that the last verse had to be built out of hands, not magic — because the world I&apos;ve been building since I was nine has magic in it, and I wanted this song to say, plainly, that no spell fixes what time tears.&lt;/p&gt;
&lt;p&gt;Then the constraints, and this is where thirty years at a keyboard actually paid off: a woman&apos;s voice, not a man&apos;s. Strings and a guitar, drums held back until the second chorus. Minor throughout, a lift into the relative major for the bridge, and a return to minor at the close — because I know exactly what that shape does, and I wanted it done to me. Fantasy-adjacent in its imagery, but with nothing that couldn&apos;t happen on a real coast in a real storm.&lt;/p&gt;
&lt;p&gt;And then, for the first time, I asked.&lt;/p&gt;
&lt;h2&gt;What came back&lt;/h2&gt;
&lt;p&gt;The chorus that came back had a line in it I would not have written on my own, and would not have let myself write if I&apos;d thought of it:&lt;/p&gt;
&lt;blockquote&gt;&lt;p&gt;&lt;em&gt;If I can lift one wounded lantern / I may become a beacon once more&lt;/em&gt;&lt;/p&gt;&lt;/blockquote&gt;
&lt;p&gt;I read that and had to put the laptop down for a minute. The machine had not invented a feeling. It had taken the context I gave it — the loss, the refusal to lie about it, the insistence that hands rebuild what magic can&apos;t — and translated it into an image I recognized as mine before I&apos;d ever seen it. That&apos;s the thing these tools can do that the productivity conversation misses entirely. Given enough truth, they can hand your own truth back to you in a form you couldn&apos;t reach.&lt;/p&gt;
&lt;p&gt;The bridge did the same:&lt;/p&gt;
&lt;blockquote&gt;&lt;p&gt;&lt;em&gt;No crown, no spell, no ancient flame / Can mend what time has torn / But hands can build a pier again / And welcome in the dawn&lt;/em&gt;&lt;/p&gt;&lt;/blockquote&gt;
&lt;p&gt;I gave it the rule. It gave me the verse. And the verse is better than the rule.&lt;/p&gt;
&lt;h2&gt;Why context is the whole game&lt;/h2&gt;
&lt;p&gt;People who are disappointed by these tools are, almost always, people who asked too little of themselves before asking anything of the machine. A thin prompt produces a thin answer — not because the model is limited, but because it has nothing to work from except the average of everything anyone has ever said about harbors. The average of everything is nobody&apos;s song.&lt;/p&gt;
&lt;p&gt;The work — and it is work — is upstream of the prompt. It&apos;s knowing what you actually mean. It&apos;s being willing to write down the constraints that make a thing yours: what it&apos;s not allowed to be, what it can&apos;t say, how it has to end. The model is extraordinary at honoring constraints and hopeless at supplying them. That division of labor is the whole game. You bring the truth and the fences. It brings the reach.&lt;/p&gt;
&lt;p&gt;I think this is going to be one of the defining skills of the next decade, and it has almost nothing to do with technology. It&apos;s the old skill of knowing yourself well enough to describe what you want — sharpened, because now there&apos;s something on the other side of the description that will take you at your word.&lt;/p&gt;
&lt;h2&gt;What it&apos;s for&lt;/h2&gt;
&lt;p&gt;I built a world when I was nine years old, and I&apos;ve been building it ever since, mostly in private. For most of my adult life the executive and the creator have lived in separate rooms. This summer the walls started coming down, and one of the first things that walked through was a song.&lt;/p&gt;
&lt;p&gt;I don&apos;t think the machine made it. I think I did, and the machine was the instrument I didn&apos;t know how to play — the one that sits next to the piano and does the parts my hands never learned. That&apos;s not a small thing. Most of us carry around hopes and fears and whole unwritten works that never make it out because we lack the craft to get them across the gap. The gap just got a lot narrower. What&apos;s on your side of it is still up to you.&lt;/p&gt;
&lt;p&gt;The song lives on its own page at &lt;a href=&quot;https://kaelon.com/harbor-from-the-storm/&quot;&gt;kaelon.com&lt;/a&gt;, with the full lyrics. It starts in a minor key, lifts in the middle, and ends where it began. That was the rule. It kept it.&lt;/p&gt;
&lt;iframe src=&quot;https://suno.com/embed/86403725-c21b-4645-8b21-c81aa3667cac&quot; width=&quot;100%&quot; height=&quot;240&quot; title=&quot;Harbor from the Storm — Kaelon, on Suno&quot; loading=&quot;lazy&quot; allow=&quot;autoplay&quot;&gt;&lt;a href=&quot;https://suno.com/song/86403725-c21b-4645-8b21-c81aa3667cac&quot;&gt;Harbor from the Storm — Kaelon, on Suno&lt;/a&gt;&lt;/iframe&gt;</content:encoded></item><item><title>Cuban Black Beans</title><link>https://juan.co/blog/cuban-black-beans/</link><guid isPermaLink="true">https://juan.co/blog/cuban-black-beans/</guid><description>Authentic Cuban Black Beans take days to prepare properly, but this expedited recipe can get you really close (and some may say, better) results in just around half an hour. I discovered this recipe through…</description><pubDate>Wed, 12 Nov 2025 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;Authentic Cuban Black Beans take days to prepare properly, but this expedited recipe can get you really close (and some may say, better) results in just around half an hour. I discovered this recipe through trial-and-error in the bachelorhood of my 20s, and have consistently improved upon it with family and friends.&lt;/p&gt;
&lt;hr id=&quot;read-more&quot; data-translation=&quot;Read more&quot;&gt;
&lt;p&gt;&lt;strong&gt;Serves: &lt;/strong&gt;4-6 generous servings&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Time: &lt;/strong&gt;30 minutes&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Ingredients: &lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;One (1) can of &lt;a href=&quot;https://www.amazon.com/Goya-Canned-Black-Beans-15-5/dp/B000VDV1UO/&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;Goya Premium Black Beans&lt;/a&gt; (15.5 oz.)&lt;/li&gt;
&lt;li&gt;One (1) can of &lt;a href=&quot;https://www.amazon.com/Goya-Black-Heatn-Serve-3-Pack/dp/B004CP5STW/&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;Goya Black Bean Soup&lt;/a&gt; (15.5 oz.)&lt;/li&gt;
&lt;li&gt;One (1) Large Sweet Spanish Onion, diced&lt;/li&gt;
&lt;li&gt;Two (2) jars of &lt;a href=&quot;https://www.amazon.com/Goya-Fancy-Sliced-Pimientos-4-Ounce/dp/B000SW1GDK&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;Goya Fancy Red Pimentos&lt;/a&gt; (4 oz. ea.), sliced or diced&lt;/li&gt;
&lt;li&gt;Four (4) or Five (5) cloves of garlic, minced or finely chopped&lt;/li&gt;
&lt;li&gt;Two (2) packets of &lt;a href=&quot;https://www.amazon.com/Goya-Sazón-Without-Annatto-Pack/dp/B0CTQ4W7K5&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;Sazón Goya without Annatto&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;One-Quarter (1/4) cup of Spanish White Wine
&lt;ul&gt;
&lt;li&gt;Rioja Blanco (White Rioja) or Albariño, suggested&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;li&gt;Four (4) or Five (5) Bay Leaves&lt;/li&gt;
&lt;li&gt;One-Half (1/2) cup of Spanish Olive Oil
&lt;ul&gt;
&lt;li&gt;Iberia (Extra Virgin) or Garcia de la Cruz (Extra Virgin), suggested&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;li&gt;&lt;em&gt;Optional: &lt;/em&gt;One (1) Tablespoon (Tbsp.) of Oregano leaves, dried&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&lt;strong&gt;Preparation: &lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Minimal preparation required, but spend a couple of minutes properly dicing the onion into fine cubes or very thin slices (if preferred) and mincing the garlic through a garlic press or dicing into super-fine chunks (if you don&apos;t have a press). Make sure all skins are removed from both vegetables. You can do this preparation while heating the oil in the first step below.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&lt;strong&gt;Directions: &lt;/strong&gt;&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;&lt;strong&gt;Sofrito: &lt;/strong&gt;Begin by making the &lt;em&gt;sofrito&lt;/em&gt;, or sautéed cooking base, in a medium-sized sauce pan or pot by heating the 1/2 cup. of olive oil on medium-high heat for about 3-4 minutes. When thoroughly heated, add the diced Sweet Spanish Onion (a &lt;em&gt;sweet onion&lt;/em&gt;, &lt;em&gt;vidalia, &lt;/em&gt;or even a &lt;em&gt;yellow onion&lt;/em&gt; are all suitable substitutes if you don&apos;t have access to the sweet Spanish variety) and minced garlic cloves. Sauté for about 10 minutes or until the onion is almost transluscent, and then add the pimentos from the jar (with juice included). Continue cooking, stirring occasionally until the &lt;em&gt;sofrito&lt;/em&gt; is properly incorporated, an additional 5 minutes.&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Frijoles&lt;/strong&gt;: Add the beans by emptying both cans directly on top of the sofrito. Do not add any additional water; the soup and rue from the &lt;em&gt;sofrito&lt;/em&gt; will suffice. Bring the entire mixture up to a boil on high heat, stirring to fold in all ingredients. Once bubbling vigorously, add the 1/4 cup. of Spanish White Wine, the 2 packets of Sazón Goya, and layer on 4-5 bay leaves. (At this time, add any other seasonings, such as the optional oregano if desired; but this is not necessary.) Stir while boiling on high continuously for 1 minute, and then immediately cover and cook on low heat to simmer. &lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Cuajar:&lt;/strong&gt; Continue to simmer on low heat for 10 minutes, stirring every 2-3 minutes from the bottom of the pan or pot to ensure beans and &lt;em&gt;sofrito&lt;/em&gt; do not get burned. Simmering should produce a light bubbling, but not a furious roar; adjust heat and/or leave the lid ajar to ensure proper temperature during this phase. Upon completion of the 10 minutes, turn off the heat and cover. Let sit for a few minutes to allow for incorporation of all ingredients. Serve with a ladel over or alongside freshly-cooked white rice (jasmine recommended) or as a meal in of itself, and salt or season to taste. &lt;/li&gt;
&lt;/ol&gt;</content:encoded></item><item><title>Liberation</title><link>https://juan.co/blog/liberation/</link><guid isPermaLink="true">https://juan.co/blog/liberation/</guid><description>On April 2nd, 2025, President Trump stepped back onto the global stage and did what few leaders have dared to do in the modern era: he lit a match and threw it directly into the towering haystack of globalization. With…</description><pubDate>Thu, 03 Apr 2025 00:00:00 GMT</pubDate><content:encoded>&lt;p class=&quot;&quot; data-start=&quot;204&quot; data-end=&quot;673&quot;&gt;On April 2nd, 2025, President Trump stepped back onto the global stage and did what few leaders have dared to do in the modern era: he lit a match and threw it directly into the towering haystack of globalization. With the quiet subtlety of a thunderclap, he declared it &lt;em data-start=&quot;475&quot; data-end=&quot;491&quot;&gt;Liberation Day&lt;/em&gt;. A new tariff regime. A new economic doctrine. A 10% tax on everything imported, with extra pain lovingly reserved for our &quot;friends&quot; in China (34%), India (27%), and Vietnam (46%).&lt;/p&gt;
&lt;hr id=&quot;read-more&quot; data-translation=&quot;Read more&quot;&gt;
&lt;p class=&quot;&quot; data-start=&quot;675&quot; data-end=&quot;977&quot;&gt;Markets promptly did what markets do when they can’t breathe—they panicked. Algorithms trembled, stock tickers bled red, and CNBC anchors clutched their pearls. And yet, somewhere in that chaos, somewhere between the soy futures crash and the Nike earnings call gone sideways, a strange light appeared.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;979&quot; data-end=&quot;991&quot;&gt;Opportunity.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;993&quot; data-end=&quot;1198&quot;&gt;Because here’s the thing: this isn’t just about tariffs. It’s not just about reshoring or tax codes or any of the traditional fare that gets trotted out on Bloomberg panels. This is about something bigger.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;1200&quot; data-end=&quot;1221&quot;&gt;This is about design.&lt;/p&gt;
&lt;h2 class=&quot;&quot; data-start=&quot;1223&quot; data-end=&quot;1247&quot;&gt;Breaking the Illusion&lt;/h2&gt;
&lt;p class=&quot;&quot; data-start=&quot;1249&quot; data-end=&quot;1485&quot;&gt;For the past three decades, we&apos;ve been sleepwalking through a world where supply chains were optimized for cost at the expense of everything else—resilience, ethics, carbon, sovereignty, soul. It was convenient. It was cheap. It worked.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;1487&quot; data-end=&quot;1503&quot;&gt;Until it didn’t.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;1505&quot; data-end=&quot;1870&quot;&gt;COVID shook us. War in Europe rattled us. The Red Sea closures whispered something ominous. And now, &lt;em data-start=&quot;1606&quot; data-end=&quot;1622&quot;&gt;Liberation Day&lt;/em&gt; rips the curtain down entirely. The myth of the frictionless global economy is over. What replaces it is something far more interesting: a world where every business must now &lt;em data-start=&quot;1798&quot; data-end=&quot;1806&quot;&gt;choose&lt;/em&gt; how to build itself—deliberately, strategically, &lt;em data-start=&quot;1856&quot; data-end=&quot;1869&quot;&gt;consciously&lt;/em&gt;.&lt;/p&gt;
&lt;h2 class=&quot;&quot; data-start=&quot;1872&quot; data-end=&quot;1908&quot;&gt;The Era of Intentional Operations&lt;/h2&gt;
&lt;p class=&quot;&quot; data-start=&quot;1910&quot; data-end=&quot;2105&quot;&gt;Think of your supply chain. Not as a chain, but as a system of belief. Who do you trust? Where do you place risk? What do you optimize for—margin, speed, carbon, flexibility, national allegiance?&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;2107&quot; data-end=&quot;2170&quot;&gt;In this new world, sourcing isn&apos;t procurement. It&apos;s philosophy.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;2172&quot; data-end=&quot;2501&quot;&gt;The businesses that win here won&apos;t be the ones that grumble and fudge prices upward. They’ll be the ones that treat this moment like the greenfield it is: a chance to reimagine &lt;em data-start=&quot;2349&quot; data-end=&quot;2361&quot;&gt;everything&lt;/em&gt;. To redesign their go-to-market. To rethink their fulfillment strategy. To decide, boldly, &lt;em data-start=&quot;2453&quot; data-end=&quot;2500&quot;&gt;what kind of company they actually want to be&lt;/em&gt;.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;2503&quot; data-end=&quot;2556&quot;&gt;Do you want to be the cheapest? Or the most reliable?&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;2558&quot; data-end=&quot;2653&quot;&gt;Do you want to chase every new market? Or double down where your logistics work like clockwork?&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;2655&quot; data-end=&quot;2750&quot;&gt;Do you want to own your supply chain? Or orchestrate a symphony of partners with shared values?&lt;/p&gt;
&lt;h2 class=&quot;&quot; data-start=&quot;2752&quot; data-end=&quot;2771&quot;&gt;Strategy by Fire&lt;/h2&gt;
&lt;p class=&quot;&quot; data-start=&quot;2773&quot; data-end=&quot;2960&quot;&gt;Make no mistake—this is not a drill. Your margins are on the front lines. Your brand is next. Already, American consumers are being told: your prices are going up. And they’re asking why.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;2962&quot; data-end=&quot;3063&quot;&gt;If your answer is, “Because China’s goods are more expensive now,” you’ve already lost the narrative.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;3065&quot; data-end=&quot;3229&quot;&gt;If your answer is, “Because we’ve redesigned our product line, switched to local assembly, and made the whole experience better,” now you&apos;re in business. Literally.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;3231&quot; data-end=&quot;3403&quot;&gt;This is a test of strategic courage. The companies that survive will be those who stop playing defense and instead ask: &lt;em data-start=&quot;3351&quot; data-end=&quot;3403&quot;&gt;What can we build now that wasn’t possible before?&lt;/em&gt;&lt;/p&gt;
&lt;h2 class=&quot;&quot; data-start=&quot;3405&quot; data-end=&quot;3450&quot;&gt;The Business Case for Patriotism (Kind Of)&lt;/h2&gt;
&lt;p class=&quot;&quot; data-start=&quot;3452&quot; data-end=&quot;3753&quot;&gt;Is it jingoistic to talk about American manufacturing? Maybe. But it&apos;s also never been more practical. In a world where shipping lanes are chessboards and container prices spike with every diplomatic sneeze, having your production 100 miles away instead of 10,000 is more than sentimental. It’s smart.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;3755&quot; data-end=&quot;3947&quot;&gt;But let’s not get misty-eyed. This isn’t a call to slap flags on boxes. It’s a call to &lt;em data-start=&quot;3842&quot; data-end=&quot;3865&quot;&gt;own your architecture&lt;/em&gt;. Design systems that serve your customers, your team, and—yes—your balance sheet.&lt;/p&gt;
&lt;h2 class=&quot;&quot; data-start=&quot;3949&quot; data-end=&quot;3973&quot;&gt;Liberation, Redefined&lt;/h2&gt;
&lt;p class=&quot;&quot; data-start=&quot;3975&quot; data-end=&quot;4029&quot;&gt;So what do we do with this so-called &lt;em data-start=&quot;4012&quot; data-end=&quot;4028&quot;&gt;Liberation Day&lt;/em&gt;?&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;4031&quot; data-end=&quot;4268&quot;&gt;We liberate ourselves—from dogma, from inertia, from lazy assumptions about how business &quot;has to&quot; be done. We liberate our business models from the tyranny of quarterly thinking. We liberate our ops teams to be designers, not just doers.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;4270&quot; data-end=&quot;4361&quot;&gt;We stop importing ideas from 1999 and start building structures that actually serve us now.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;4363&quot; data-end=&quot;4570&quot;&gt;This isn’t just a policy shift. It’s an inflection point. One of those rare moments where you can feel the gears of the world shift beneath your feet. If you&apos;re standing still, you&apos;re already falling behind.&lt;/p&gt;
&lt;p class=&quot;&quot; data-start=&quot;4572&quot; data-end=&quot;4624&quot;&gt;But if you lean in? You might just build the future.&lt;/p&gt;</content:encoded></item><item><title>WordPress is entering its &quot;end-stage founder&quot; period</title><link>https://juan.co/blog/wordpress-is-entering-its-end-stage-founder-period/</link><guid isPermaLink="true">https://juan.co/blog/wordpress-is-entering-its-end-stage-founder-period/</guid><description>It takes a special personality to bring something into existence: grit, passion, vision. But most Founders lack the self-awareness to embrace the limitations to scale their creations. That&apos;s where people like me</description><pubDate>Sun, 06 Oct 2024 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;&lt;span&gt;I exit Founders for a living. &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span&gt;It takes a special personality to bring something into existence: grit, passion, vision. But most Founders lack the self-awareness to embrace the limitations to scale their creations. That&apos;s where people like me enter.&lt;/span&gt;&lt;/p&gt;
&lt;hr id=&quot;read-more&quot; data-translation=&quot;Read more&quot;&gt;
&lt;p&gt;&lt;span&gt;WordPress is entering its &quot;end-stage founder&quot; period. And creations of all sizes - startups, established companies, even thriving enterprises - all approach this extremely dangerous period of their lives where they are forced to confront a basic question: Is the Creation more than just the expression of its Creator? Or do the countless contributors - customers, partners, users, audiences, etc. - actually matter beyond just being passive recipients of the Founder&apos;s will? &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span&gt;Having been a Founder myself, it&apos;s an incredibly humbling confrontation and the petty petulance that we instinctively feel requires profound soul-searching to decide what future fate we seek for the ecosystems we have created. It may be surprising that WordPress, the ostensibly open source content management system, or CMS, that powers about 40% of the web&apos;s actively visited and tracked websites, is reaching this moment more than two decades after its emergence onto the scene. But when one looks at the typical factors that lead to end-stage founder periods, you&apos;ll see we&apos;re more or less right on schedule: &lt;/span&gt;&lt;/p&gt;
&lt;h2&gt;&lt;span&gt;&lt;strong&gt;&lt;span&gt;End-Stage Founder Periods&lt;/span&gt;&lt;/strong&gt;&lt;/span&gt;&lt;/h2&gt;
&lt;p&gt;(3 Steps to Recognizing Them)&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;&lt;span&gt;&lt;strong&gt;Go-To-Market repeatedly breaks or stalls out. &lt;/strong&gt;Typified by either flat-line growth, or by inexplicable and un-reproducible growth curves, that cannot be easily understood or truly explained by founders and their teams. Higher than normal customer churn and employee attrition (voluntary or otherwise) are good signs of this. Jettisoning the clients and people who got you where you are demonstrates not just a lack of alignment, but a failure of leadership and direction.&lt;br&gt;&lt;br&gt;&lt;/span&gt;&lt;/li&gt;
&lt;li&gt;&lt;span&gt;&lt;strong&gt;Competitive threats start becoming the focus&lt;/strong&gt;, and the Founder starts attacking them rather than driving a unique and differentiated vision for their creations. Truly successful companies have no competitors, and see themselves as such, but the first sign of founder insecurities overcoming commonsense is a misprioritization on external players and going after them.&lt;br&gt;&lt;br&gt;&lt;/span&gt;&lt;/li&gt;
&lt;li&gt;&lt;span&gt;&lt;strong&gt;Work becomes suddenly harder, with no signs of stopping.&lt;/strong&gt; Founders often panic when they do not recognize the shifting landscape, especially when it&apos;s the sand beneath their own feet. They revert to the same core tactics they used to build their creations, which aren&apos;t usually fit for purpose, and then drive people, processes, and programs to the brink of failure. They will blame others (usually by faux-blaming themselves), and then search for heroes, both within and without, to support their view and try new (but honestly, the same) motions. &lt;/span&gt;&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;&lt;span&gt;There are no heroic saves to the End-Stage Founder problem. The Vision that they set out for their company was either never shared, or not aspirational enough for others to align. &lt;span&gt;In almost 95% of all cases, founder-led companies collapse. &lt;/span&gt;Money has only 2 out of 20 reasons to account for failure (see: CBInsights Post-Mortems, 2021-2023). &lt;/span&gt;&lt;span&gt;Wildly successful and profitable companies making hundreds of millions of dollars every year can precipitously collapse in ways that, to an outsider, seem bizarre, but to insiders, was all-too-telling. &lt;/span&gt;&lt;/p&gt;
&lt;h3&gt;&lt;span&gt;&lt;span&gt;Scaling Requires the Founder to Exit&lt;/span&gt; &lt;/span&gt;&lt;/h3&gt;
&lt;p&gt;&lt;span&gt;All Founders Exit, but not all exits look the same. For some, they leave the companies they founded and go on sabbatical for years to rediscover their purpose, gain perspective through humility, and decide what they would like to learn and how they&apos;d like to contribute before even deciding whether they want to rejoin their Creations. For others, they are unceremoniously fired by their employees, shareholders, or a commercially-driven legal process (such as a hostile take-over, or an investor revolt). A select few will embrace the change, and step back to take a role where they aren&apos;t involved in the day to day, but can help listen generously and aspire to support the next generation of leaders. &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span&gt;Every great company outlasts the life of its founder. Most companies collapse with the demise of the founder, because the founder never truly empowered their teams, listened to their customers or the market, and gleamed a fundamental lesson as to why the Founder and their Vision is fundamentally myopic: &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;em&gt;&lt;span&gt;&lt;span&gt;You cannot always know your mission (your plan to execute on your vision), but you must always listen generously to the unknowable needs of future clients and communities in the marketplace of ideas. And in that interchange - of putting the customer at the heart of who you are and what you do - do you suddenly discover your new focus, and your Vision becomes alive again in renewed purpose.&lt;/span&gt; &lt;/span&gt;&lt;/em&gt;&lt;/p&gt;
&lt;p&gt;&lt;span&gt;This lesson is what fundamentally leads great companies like Disney &lt;/span&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt;to embrace the unknowable future that it is in the business of making dreams come true - leading them to create theme parks, live action movies, and intellectual property across countless lines of production to better drive engagement from generations of customers - whereas not-so-great companies like Hanna-Barbera, who had out-competed Disney for a few years as the number one purveyor of animated entertainment on the planet, never embraced a vision beyond just making great cartoons. And truly great companies, like Apple and Amazon&lt;/span&gt;&lt;span&gt;, plan for their own founders&apos; exits long before the confrontation needs to be made. &lt;/span&gt;&lt;/p&gt;
&lt;h3&gt;&lt;span&gt;&lt;span&gt;What should WordPress do?&lt;/span&gt; &lt;/span&gt;&lt;/h3&gt;
&lt;p&gt;&lt;span&gt;I&apos;ve serendipitously built a career out of helping companies rediscover their purpose through the eyes of their customers - past, present, and especially future - and in doing so, help reinvent themselves to aspire to be greater than they could possibly have ever imagined through the original single-person concept that the Founder had espoused. Unfortunately, WordPress&apos; founder, Matt Mullenweg, is going down the path of the majority of founders who encounter the malaise of mediocrity borne of their own limited vision: destroying their own creation. And by some views, it may seem to be intentional in an effort to force some sort of heroic breakthrough. It will fail, because remember: there are no heroes in the end-stage of founder-led cycles. &lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;span&gt;But there is a solution, and it is one that I&apos;ve been privileged to learn over the past 25 years as a Chief Customer Officer, a Chief Operating Officer, and even interim Chief Executive Officer of startups backed by great private equity scale-ups such as &lt;/span&gt;Vista Equity and Insight Partners, &lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt;or fueled by investor-conscious market-driven forces. And it&apos;s to listen. &lt;/span&gt;&lt;/p&gt;
&lt;div&gt; &lt;/div&gt;
&lt;div&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt;(I share this forecast and advice knowing full well that WordPress and Matt Mullenweg will likely block me, despite the fact that I, like so many of the hundreds that they have (or really, he has) blocked, helped build this ecosystem and ushered in thousands of organizations and millions of users to WordPress over the years. This tyrannical block-fest is part of the myopic Founder&apos;s last throes before ultimately being displaced into a new normal.) &lt;/span&gt;&lt;/div&gt;
&lt;ol&gt;
&lt;li&gt;&lt;strong&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit;&quot;&gt;Do not turn on your people.&lt;/span&gt;&lt;/strong&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt;&lt;strong&gt; &lt;/strong&gt;Your clients, team members, and partner ecosystem are delivering valuable feedback. Don&apos;t take it literally, and study it generously. And especially, do not turn on the people who have helped you breathe life to your creation. Doing so will only accelerate their exodus from your orbit, realizing that according to its creator, the WordPress creation doesn&apos;t live beyond the Founder&apos;s fulcrum.&lt;br&gt;&lt;br&gt;&lt;/span&gt;&lt;/li&gt;
&lt;li&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt;&lt;strong&gt;Step the Founder back.&lt;/strong&gt; &lt;/span&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt; Launching a desperate public relations offensive against WPEngine has emboldened and granted tremendous credibility to detractors when you should actually be building the space for your promoters (and even passives) to start taking control of your creation&apos;s future. Moving away from the day-to-day and handing over the operation to a tried-and-true professional can be tempered with a Founder&apos;s continuing directional vision-setting and future-casting in a way that doesn&apos;t disrupt, but just contributes on equal-footing, the creation&apos;s continued evolution. (This is what has recently been termed &quot;Founder-Mode,&quot; to allow a modest contribution to strategic direction without overriding the operational agenda of your executives.) For Matt? A Chairman, or even better, Chairman Emeritus role, will be best at this time. Longer term, it may be time to sell Matt&apos;s controlling stake to prevent the Founder&apos;s impulse to intervene and impose their imperium upon others. It does not end well, always. It will always rear, after all, as Matt has recently told The Verge: &quot;WordPress just belongs to me.&quot; And indeed, with that attitude, it is destined to never be more than his plaything.&lt;br&gt;&lt;br&gt;&lt;/span&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit;&quot;&gt;Reinvent. &lt;/span&gt;&lt;/strong&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt; This crisis would have never come about, honestly, if the original Founder&apos;s Vision hadn&apos;t met its logical end. The Web has reached mature saturation: the economics have been largely optimized, and now the very essence of what created the fertile soil on which WordPress was founded - user-generated content with view-driven community-building - has been exposed as, sadly, without much commercial value. Artificial Intelligence, especially generative AI, is creating a new generation that is rendering much of the web and its knowledge largely unusable. There isn&apos;t much of a future for WordPress, or any traditional content management system, that doesn&apos;t prioritize a new form of knowledge sharing and content discovery that is largely immune from the flotsam of fabricated misinformation. But if WordPress can make the leap to a new modality, a new medium, and side-step the mobile wars and AR/VR search-fest, it could become a new brand that transcends - rather than is defined by - the crisis in which we find ourselves. It just starts with listening generously (see Step 1) and finding the problems that people are trying to solve, that no one is yet solving. How will WordPress&apos; core vision, values, and mission help confront those challenges? &lt;/span&gt;&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;&lt;span style=&quot;color: var(--text-primary-color); font-family: var(--editor-font-family); font-size: inherit; font-weight: var(--font-weight-normal);&quot;&gt;Until Matt&apos;s war against his own creation&apos;s fans ends, we will never know. But history shows that most Founders don&apos;t relinquish their control, and unless outside forces (investors, ecosystem magnates, significant partners, etc.) compel them to, they are more likely to bring down their creation rather than stomach the possibility that they actually, finally have to let go in order to see it become what they could never envision.&lt;/span&gt;&lt;/p&gt;
&lt;p&gt;&lt;em&gt;(Crossposted to &lt;a href=&quot;https://x.com/Kaelon/status/1843013559980003682&quot; target=&quot;_blank&quot; rel=&quot;noopener&quot;&gt;Twitter&lt;/a&gt; and &lt;a href=&quot;https://hackernoon.com/wordpress-is-entering-its-end-stage-founder-period&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;HackerNoon&lt;/a&gt;.)&lt;/em&gt;&lt;/p&gt;</content:encoded></item><item><title>The Check-In</title><link>https://juan.co/blog/the-check-in/</link><guid isPermaLink="true">https://juan.co/blog/the-check-in/</guid><description>&quot;This meeting could have been an email,&quot; goes the professional&apos;s lament these days. Far too many leaders in business waste valuable time and money on pointless meetings with their direct reports. The Check-In should be…</description><pubDate>Tue, 13 Feb 2024 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;&quot;This meeting could have been an email,&quot; goes the professional&apos;s lament these days. Far too many leaders in business waste valuable time and money on pointless meetings with their direct reports. The Check-In should be an opportunity for leaders to provide support to their team members, but there are three things they need to do.&lt;/p&gt;
&lt;hr id=&quot;read-more&quot; data-translation=&quot;Read more&quot;&gt;
&lt;p&gt;Three key elements of a successful check-in consist of the &lt;strong&gt;Agenda&lt;/strong&gt;, &lt;strong&gt;Performance&lt;/strong&gt;, and &lt;strong&gt;Discussion&lt;/strong&gt;.&lt;/p&gt;
&lt;h2&gt;Agenda&lt;/h2&gt;
&lt;p&gt;Use a standing meeting agenda or living working document to keep the meeting, which should ordinarily be 30 minutes or less, on track with its intended purpose: making sure your team members are supported and that, as their leader, you understand how to keep them on the track to success. Use the following template for your team member to own and fill out ahead of the meeting:&lt;/p&gt;
&lt;pre&gt;1. Updates since Last Week&lt;br&gt;2. Priorities for This Week&lt;br&gt;3. Issues and Blockers&lt;/pre&gt;
&lt;ol&gt;
&lt;li&gt;&lt;strong&gt;Updates since Last Week&lt;/strong&gt;&lt;br&gt;Summarize major accomplishments, progress, or outcomes against the priorities previously discussed. Include any significant milestones or deliverables against initiatives or projects.&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Priorities for This Week&lt;/strong&gt;&lt;br&gt;Identify the top 3 to 7 priorities (i.e., outcomes, achievements, or deliverables) for this week. Avoid a discussion of activities (i.e., what you are doing) and instead focus on results (i.e., what you hope to accomplish). These should all be connected with the team member&apos;s ongoing performance goals (see below).&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Issues and Blockers&lt;/strong&gt;&lt;br&gt;Share any problems or concerns, including feedback, you may have. Classify them by &lt;span class=&quot;k&quot;&gt;severity&lt;/span&gt; as follows: &lt;br&gt;&lt;br&gt;
&lt;ol&gt;
&lt;li&gt;&lt;strong&gt;Severity 1: &lt;/strong&gt;This issue or blocker prevents me from moving forward, and I need your help (as my leader) to clear this blocker with me.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Severity 2: &lt;/strong&gt;This issue or blocker has some impact on me moving forward, but I am able to manage this on my own and am just letting you know.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Severity 3: &lt;/strong&gt;This issue or blocker has little to no impact on me moving forward, but I think you should know about it and I welcome your feedback.&lt;/li&gt;
&lt;/ol&gt;
&lt;/li&gt;
&lt;/ol&gt;
&lt;h2&gt;Performance&lt;/h2&gt;
&lt;p&gt;Team members should be updating their performance - the metrics and leading indicators, as well as the measurable business outcomes - on a regular (daily and weekly) basis. You can use a centralized performance management system, or even just a shared spreadsheet or note-taking tool. These should track back to monthly and quarterly goals and objectives - for themselves, their teams, the department, and the company as a whole. Each goal should be reported as follows:&lt;/p&gt;
&lt;pre&gt;Goal: The measurable goal for the month/quarter.&lt;br&gt;Metric (a): Quantifiable progress achieving the goal.&lt;br&gt;Metric (b): Quantifiable progress achieving the goal.&lt;br&gt;Metric (c): Quantifiable progress achieving the goal.&lt;/pre&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;Goals&lt;/strong&gt;&lt;br&gt;Goals should be measurable and specific outcomes that the individual, the team, the department, and the company all find valuable and aligned for business results. Avoid vague qualifiable goals (e.g., &quot;Land some amazing clients&quot; or &quot;Deliver great customer experience&quot;) and instead focus on quantifiable goals (e.g., &quot;Close $3M in new business this quarter&quot; or &quot;Maintain an average Customer Satisfaction rating of 4.0 or higher&quot;). &lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Metrics&lt;br&gt;&lt;/strong&gt;Metrics should be reportable progress or updates on how the individual or team is tracking towards that goal. While performance is rarely linear, having insight into how much effort remains to achieve the goal is important in a conversation. Focus only on the numerical results that are directly applicable to the goal (e.g., &quot;Closed $1.5M quarter-to-date&quot; or &quot;Current CSAT average is 4.1 quarter-to-date&quot;).&lt;/li&gt;
&lt;/ul&gt;
&lt;h2&gt;Discussion&lt;/h2&gt;
&lt;p&gt;With an agenda pre-filled out by your team member and performance tracking maintained consistently, the check-in discussion should be anchored principally upon elevating topics where the leader can support the team member. Support should consist of:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Clearing obstacles, blockers, or issues preventing progress or forward-motion&lt;/li&gt;
&lt;li&gt;Identifying additional resources or assistance needed to perform on targets&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;In a typical 30-minute check-in, consider devoting around 20 minutes to the discussion. Leaders should ask questions and listen generously to their team members. Repeat what team members say to ensure that it is being well-understood and properly internalized. Team Members should be actionable and results-oriented. &lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;Example leader talking points&lt;/strong&gt;:&lt;br&gt;
&lt;ul&gt;
&lt;li&gt;&quot;I noticed limited progression against this priority last week. Can you tell me more about this? How can we get this back on track?&quot;&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&quot;You&apos;ve identified this as a priority for this week, but I&apos;m not sure it&apos;s connected with the goals we&apos;ve previously discussed. Can you tell me more about why you&apos;ve selected this?&quot;&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&quot;You listed this issue as a Severity 1 item. Tell me more about how this problem is preventing progress, and how I can help remove it as an obstacle.&quot;&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Example member talking points:&lt;br&gt;&lt;/strong&gt;
&lt;ul&gt;
&lt;li&gt;&quot;We had an unexpected problem last week and it prevented me from making much progress against this priority. I&apos;ve adjusted this week&apos;s objectives to include it, and I do not think it will have an impact on the my monthly or quarterly goals.&quot;&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&quot;I&apos;ve added a new priority this week that aligns with a personal goal we&apos;ve previously discussed. While we&apos;re not tracking this as a top-level goal for the team, it&apos;s important to me as a part of my professional development and I would like your support. Here&apos;s why.&quot;&lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&quot;I&apos;ve run into a serious problem with which I need your help. Until I can overcome this obstacle, I&apos;m a stand-still with this priority or initiative. Can we tackle this problem together?&quot;&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Dedicate the final 10 minutes of the meeting to review next steps and action items. Both the leader and the team member will have new priorities and follow-up activities in order to make progress. The leader may need to bring additional resources or support for the team member to be successful. The team member may need to gather further information or deliver a specific outcome in order to continue making progress. Transparency and shared accountability are key, and the plan for the next week - both in priorities and updates - should be reflective of the conversation&apos;s topics.&lt;/p&gt;
&lt;p&gt;Running a great check-in is about avoiding micro-management (i.e., the leader telling the team member what to do or how to do it) and instead focusing on supporting the team member in their work (i.e., the leader ensuring the team member is able to make progress against priorities that they both find valuable). If there is limited progress, or an issue/problem that arises, the check-in is the right place to call it out openly and honestly. In this way, check-ins can remain outcomes-oriented and can drive a supportive stewardship relationship between the leader and the team member.&lt;/p&gt;</content:encoded></item><item><title>Generative Art Prompts</title><link>https://juan.co/blog/generative-art-prompts/</link><guid isPermaLink="true">https://juan.co/blog/generative-art-prompts/</guid><description>When you want to use Generative Artificial Intelligence to create artwork, like Stable Diffusion, DALL-E, or Midjourney, how you structure your prompt largely determines what the large models will produce. Here are a…</description><pubDate>Sun, 04 Feb 2024 00:00:00 GMT</pubDate><content:encoded>&lt;p&gt;When you want to use Generative Artificial Intelligence to create artwork, like Stable Diffusion, DALL-E, or Midjourney, how you structure your prompt largely determines what the large models will produce. Here are a few rules and examples to follow.&lt;/p&gt;
&lt;hr id=&quot;read-more&quot; data-translation=&quot;Read more&quot;&gt;
&lt;h2&gt;How to Prompt&lt;/h2&gt;
&lt;p&gt;Craft your prompt with the following structure:&lt;/p&gt;
&lt;p&gt;&lt;code&gt;[image content/subject, description of action, state and mood],&lt;/code&gt;&lt;/p&gt;
&lt;p&gt;Your first comma will delineate between subject and style.&lt;/p&gt;
&lt;p&gt;&lt;code&gt;[art form, style, and artist references],&lt;/code&gt;&lt;/p&gt;
&lt;p&gt;The second will influence the way the subject is stylized and allow final framing.&lt;/p&gt;
&lt;p&gt;&lt;code&gt;[additional settings, such as lighting, colors, and framing]&lt;/code&gt;&lt;/p&gt;
&lt;h2&gt;Elements of a Prompt&lt;/h2&gt;
&lt;p&gt;Generative Art Prompts should consist of &lt;strong&gt;three&lt;/strong&gt; elements, in order of your writing:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;&lt;strong&gt;Subject&lt;br&gt;&lt;/strong&gt;Start with the subject or content of the image. Do you want a photo of a city? Or a portrait of a person? Be sure to describe what the subject is doing, how they&apos;re doing it, and a mood. &lt;br&gt;&lt;br&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Style&lt;br&gt;&lt;/strong&gt;Inform the model towards a specific aesthetic. Is it a watercolor painting? A sculpture? A lo-fi image? Consider typical artforms: photography, paintings, illustrations, digital art or 3D renders, film stills, and countless other forms. Mix and match and experiment with styles to produce starkly different results.&lt;strong&gt;&lt;br&gt;&lt;br&gt;&lt;/strong&gt;&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Settings&lt;br&gt;&lt;/strong&gt;Finally, add more details to your prompt. Give details about the framing (close-up, background, etc.), perspective (wide-shot, point-of-view, cinematic lens, etc.), lighting (soft light, hard light, dramatic lighting, or times of day, like morning, sunset, twilight, etc.), color scheme (purples or reds, halcyons or magentas, etc.), levels of detail and realism (such as hyper-realistic or mention a specific artist or engine to achieve a clear look). &lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Without all three elements, you can still produce impressive or arresting images, even if you only list two of the three, but you lose a lot of fine control. The options below described both &lt;strong&gt;subject&lt;/strong&gt; and &lt;strong&gt;style&lt;/strong&gt; but not &lt;strong&gt;settings:&lt;/strong&gt;&lt;/p&gt;
&lt;div class=&quot;gallery&quot; contenteditable=&quot;false&quot; data-is-empty=&quot;false&quot; data-translation=&quot;Add images&quot; data-columns=&quot;2&quot;&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_business.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_business-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_creativity.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_creativity-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_policy.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_policy-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_technology.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_technology-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;/div&gt;
&lt;p&gt;Look at what happens to the same four images when you apply all three elements (subject, style, and settings).&lt;/p&gt;
&lt;div class=&quot;gallery&quot; contenteditable=&quot;false&quot; data-is-empty=&quot;false&quot; data-translation=&quot;Add images&quot; data-columns=&quot;2&quot;&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_prompted_business.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_prompted_business-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_prompt_creative.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_prompt_creative-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_prompt_policy.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_prompt_policy-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;figure class=&quot;gallery__item&quot;&gt;&lt;a href=&quot;/media/posts/3/gallery/juandotco_prompt_tech.png&quot; data-size=&quot;1024x1024&quot;&gt;&lt;img src=&quot;/media/posts/3/gallery/juandotco_prompt_tech-thumbnail.png&quot; alt=&quot;&quot; width=&quot;768&quot; height=&quot;768&quot;&gt;&lt;/a&gt;&lt;/figure&gt;
&lt;/div&gt;
&lt;h2&gt;Other Considerations&lt;/h2&gt;
&lt;p&gt;Each generative AI model has its own quirks and commands, so you&apos;ll be well-served if you teach yourself some of those parameters because they can really help drive the output. For example, Midjourney considers the following parameters in their prompts:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;&lt;code&gt;&lt;strong&gt;--chaos&lt;/strong&gt;&lt;/code&gt; changes how varied the results will be, with 0 being the least and 100 being the most. For example, &lt;code&gt;&lt;strong&gt;--chaos 80&lt;/strong&gt;&lt;/code&gt; would be highly varied.&lt;/li&gt;
&lt;li&gt;&lt;code&gt;&lt;strong&gt;--no&lt;/strong&gt;&lt;/code&gt; handles your negative prompts, things you don&apos;t want to see in your image. For example, &lt;code&gt;&lt;strong&gt;--no buildings&lt;/strong&gt;&lt;/code&gt; will prevent the model from drawing buildings.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;&lt;code&gt;--ar&lt;/code&gt; &lt;/strong&gt;changes the aspect ratio of the image. For example, &lt;strong&gt;&lt;code&gt;--ar 16:9&lt;/code&gt; &lt;/strong&gt;would render the image in a 16:9 aspect ratio.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;&lt;a href=&quot;https://docs.midjourney.com/docs/parameter-list&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;Midjourney has specific parameters&lt;/a&gt; that continue to evolve with each major version and release, while &lt;a href=&quot;https://www.datacamp.com/tutorial/an-introduction-to-dalle3&quot; target=&quot;_blank&quot; rel=&quot;noopener noreferrer&quot;&gt;DALL-E&lt;/a&gt; is built-in to OpenAI&apos;s API and ChatGPT&apos;s premium framework that is much more conversational. &lt;/p&gt;</content:encoded></item></channel></rss>